|
|||||||||
About us
The lake was excavated over a two year period between 1994 and 1996.
Tree's were planted around the lake banks to complete the landscaping of the site. The lake is designed in the shape of a clover leaf and covers an area of 3.5 acres. 6 platforms have already been constructed with more planned for the future. Selley Bridge Farm
|
|||||||||
|
|||||||||